Skip to product information
1 of 7

Morphiq™ 3D Model & Body Composition Analysis System

Morphiq™ 3D Model & Body Composition Analysis System

Morphiq™ is a professional 3D body scanner for clinics, physiotherapists, gyms and wellness providers. It combines realistic 3D body modelling, 10 automatic body measurements and 22 body composition indicators within one integrated system, using eight-electrode DSM-BIA technology for detailed body composition assessment. Integrated posture and alignment analysis broadens its use across aesthetic, fitness, physiotherapy and rehabilitation settings.

Call 0330 102 5578 or email info@puretoneaesthetics.com to arrange an appointment or book a demonstration

In stock

  • Free 1-to-1 Certified Training Delivered In Your Clinic
  • Nationwide promotion generating local patient enquiries for your clinic
  • Ongoing clinical support with direct access to your trainer
  • Flexible finance from as little as £14 per day
View full details

Advanced body analysis in one professional system

Morphiq™ brings together 3D body scanning, automatic body measurement, multi-frequency body composition analysis and posture assessment in one platform.

The system creates a detailed digital body model, records 10 key measurements and analyses 22 indicators covering areas such as body fat, muscle, body water, visceral fat, BMI and metabolic age. Results are presented on a large 27-inch HD touchscreen and can also be viewed on a PC or mobile phone, printed or shared with the client.

Client standing on the Morphiq platform during a 3D body composition scan

A complete view of body shape and composition

Morphiq™ combines visual body-shape analysis with detailed physiological data, giving practitioners a broader understanding of each client’s physical profile.

The 3D model can be viewed from multiple angles, while body measurements, segmental fat and muscle data, and posture information are brought together within one assessment system. This makes Morphiq™ suitable for a wide range of professional settings, from aesthetic and body-contouring clinics to gyms, physiotherapy practices and wellness centres.

Request More Information
Digital male and female 3D body models created by the Morphiq scanning system

Turn complex body data into a clear visual consultation

Morphiq™ automatically generates a detailed 3D model of the client and records key areas of the body without relying solely on manual tape measurements. Practitioners can bring the visual model, automatic measurements and body composition results together to create a more informative consultation and establish an objective baseline before a treatment, fitness or wellness programme begins.

Repeat assessments make it easier to compare changes in body shape, measurements and composition over time, helping businesses demonstrate progress that may not always be obvious from weight or photographs alone.

  • Real 3D body modelling

    Creates a detailed visual model of the client’s body shape for consultation and comparison.

  • 10 Automatic Body Measurements

    Records key measurements including waist, hips, bust, arms, thighs and calves.

  • 22 Body Composition Indicators

    Analyses fat, muscle, body water, BMI, visceral fat, metabolic age and more.

  • 8-Electrode DSM-BIA

    Uses multi-point bioelectrical impedance analysis for detailed body composition assessment.

  • 3D Progress Comparison

    Compares changes in body shape, measurements and composition across repeat assessments.

  • Posture & Alignment Assessment

    Reviews areas including head position, shoulder balance, body tilt, pelvis, knees and leg alignment.

  • 27-Inch HD Touchscreen

    Presents body models, measurements and reports clearly during the consultation.

  • Flexible Report Sharing

    Display results on screen, print reports or send them directly to the client’s phone.

Morphiq body composition analysis report displayed on a tablet

Detailed body composition analysis beyond weight alone

Morphiq™ analyses 22 body composition indicators to give clinics a more complete view of each client’s physical profile.

Alongside weight and BMI, the system measures data including body fat percentage, lean body mass, skeletal muscle, visceral fat level, total body water, protein, basal metabolic rate and metabolic age. It also provides segmental fat and muscle analysis, helping practitioners understand how body composition is distributed across different areas rather than relying on one overall figure.

This gives clinics stronger baseline data, more informed consultations and a clearer way to monitor progress across body-contouring, weight-management, fitness and wellness programmes.

Close-up of the Morphiq rotating 3D body scanning platform

Posture assessment for broader clinical applications

Although Morphiq™ is primarily designed around body shape and body composition analysis, it also includes an integrated posture assessment system.

The platform evaluates areas such as head position, shoulder alignment, body tilt, pelvic position, knee alignment and leg shape. Results are presented visually alongside measured values, helping physiotherapists, rehabilitation specialists, fitness professionals and wellness clinics identify postural imbalances and monitor change over time.

This additional functionality broadens the system’s use without taking focus away from its core role as a professional 3D body modelling and body composition platform.

Joolia Gilvey, Nurse Prescriber and owner of The Clinic Norwich

Joolia Gilvey | Nurse Prescriber and Owner of The Clinic Norwich

“Morphiq has given us a much clearer way to show clients where they are starting and how their body is changing over time. The 3D visual model and body composition data make consultations more engaging, and clients respond well to seeing measurable progress rather than relying on weight alone.”

⭐⭐⭐⭐⭐

Discover how Morphiq™ can help you attract new clients, deliver more informative consultations and generate additional revenue through 3D body modelling, body composition analysis and progress tracking.

Call us on 0330 102 5578 or email info@puretoneaesthetics.com to request a quote, arrange an appointment, or book a no-obligation demonstration.

Morphiq 3D body analysis systems displayed in a professional wellness centre

Make every consultation more visual, measurable and engaging

Morphiq™ helps turn body data into a clearer client conversation. Rather than relying only on photographs, weight or manual measurements, practitioners can present a detailed 3D model, body composition results and repeat comparison data in a format that is easier for clients to understand.

Reports can be displayed across multiple terminals, printed or sent to the client’s phone, making it easier to review findings during the consultation and refer back to progress over time. This can help support client engagement, strengthen treatment planning and encourage repeat assessments throughout a body-contouring, weight-management or wellness programme.

Morphiq body composition and progress report shown on the 27-inch touchscreen

Track change across every stage of the client journey

Morphiq™ allows clinics to store body measurement data and compare repeat assessments over time, creating a more consistent way to monitor progress from the initial consultation through to treatment completion and ongoing maintenance.

Changes in body shape, circumference and composition can be reviewed side by side, helping practitioners identify meaningful improvements that may not be reflected by weight alone. This gives clients clearer evidence of progress and provides clinics with useful data to support follow-up consultations, programme reviews and repeat bookings.

Create a valuable new assessment service

Morphiq™ can be introduced as a standalone body-analysis service or incorporated into body-contouring, weight-management, fitness and wellness programmes. Clinics can offer an initial baseline scan followed by scheduled progress assessments, creating an additional revenue stream while giving clients a clearer way to understand and follow their results.

  • Built for a wide range of professional settings

    Morphiq™ can support clinics and practitioners who need a clearer, more objective way to assess body shape, composition and physical change.

  • Aesthetic and body-contouring clinics

    Establish a detailed baseline before treatment and compare changes in body shape, circumference and composition over time.

  • Weight-management and wellness clinics

    Look beyond body weight alone with data covering fat, muscle, visceral fat, body water, metabolic age and other key indicators.

  • Physiotherapy and rehabilitation practices

    Use integrated posture assessment to review alignment, identify visible imbalances and monitor change during a programme.

  • Fitness studios and personal trainers

    Give clients a more complete view of their progress through body composition, segmental analysis and repeat 3D comparisons.

Morphiq body composition analysis report displayed on a tablet

Flexible reporting for consultations and follow-up

Morphiq™ makes assessment results easier to present, share and revisit. Reports can be viewed on the main touchscreen, displayed through the clinic’s PC system, printed or sent to the client’s phone.

This gives practitioners flexibility during the consultation while also allowing clients to retain a clear record of their results. Stored assessment data can then be used for future comparisons, helping create a more consistent follow-up process across longer treatment, fitness or wellness programmes.

Everything you need to introduce Morphiq™ into your clinic

Morphiq™ is supplied with practical support from Pure Tone Aesthetics to help your team set up the system, understand its capabilities and use it confidently within client consultations.

  • 1-to-1 Certified training

    Receive dedicated training covering system operation, client assessments, report interpretation and how to integrate Morphiq™ into your consultation process.

  • Ongoing clinical and technical support

    Your support continues after training, with access to our team whenever you need guidance with the system, reports or day-to-day operation.

  • Delivered, installed and set up by our engineer

    Morphiq™ is professionally delivered and installed, with the system set up and checked before handover to your team.

  • Flexible finance available

    Spread the cost of the system with flexible finance options designed for professional clinics, subject to status and approval.

  • 2 Year Extended Warranty

    Enjoy peace of mind with our 2 year extended warranty coverage, ensuring your investment is protected.

1 of 5

Why choose Pure Tone Aesthetics?

  • Dr Apostolos plastic surgeon and Pure Tone Aesthetics customer

    Dr.Apostolos | Plastic Surgeon

    "Pure Tone Aesthetics stands out for their exceptional product quality and innovation. Their devices deliver outstanding results, their technical support is unparalleled—always responsive, knowledgeable, and ready to assist with any queries"

  • Joolia Gilvey, Nurse Prescriber and owner of The Clinic Norwich

    Joolia Gilvey | Nurse Prescriber and Owner of The Clinic Norwich

    “The team at Pure Tone Aesthetics are knowledgeable, professional and genuinely supportive. Their attention to detail and commitment to service give practitioners confidence in the equipment they are using, while helping ensure a positive experience for clients. I would happily recommend Pure Tone Aesthetics to any clinic looking for high-quality technology backed by dependable training and ongoing support.”

  • Emma Noble nurse practitioner at The Laser Rooms Hartlepool

    Emma Noble | Nurse Practitioner & Owner | The Laser Rooms Hartlepool

    "The team at Pure Tone is not only professional but also incredibly friendly. Their expertise and attention to detail ensure that both practitioners and clients achieve the best outcomes. I highly recommend Pure Tone Aesthetics for anyone seeking reliable, high-quality equipment backed by superb support and a team you can trust"

1 of 3

Morphiq™ 3D Body Scanner FAQs

Everything you need to know about body measurements, body composition analysis, scan preparation, suitability, reporting and progress tracking.

Collapsible content

What does Morphiq™ measure?

Morphiq™ combines 3D body modelling with body composition analysis. It creates a realistic 3D body model, automatically records key circumference measurements and analyses data including body fat, lean body mass, skeletal muscle, visceral fat, body water, BMI, basal metabolic rate and metabolic age.

How does Morphiq™ measure body composition?

The system uses an 8-electrode DSM-BIA measurement method to analyse body composition.

Which 22 body composition indicators does Morphiq™ analyse?

Morphiq™ analyses 22 body composition indicators:

Target weight, weight management, muscle control, fat control, weight, total moisture content, protein, waist-to-hip ratio, metabolic age, body fat, lean body mass, BMI, body fat percentage, segmental fat, visceral fat level, overall score, inorganic salts, skeletal muscle, segmental muscles, basal metabolic rate, intracellular fluid and extracellular fluid.

Which 10 body measurements does Morphiq™ record automatically?

Morphiq™ records 10 automatic body measurements: shoulder width, bust, waist, hips, left arm circumference, right arm circumference, left thigh circumference, right thigh circumference, left calf circumference and right calf circumference.

What happens during a Morphiq™ assessment?

The client stands on the scanning platform while the system captures the information required to create a 3D body model. Body composition is measured through the integrated eight-electrode DSM-BIA system. The results are then presented through the Morphiq™ interface for review with the practitioner.

How should clients prepare for a Morphiq™ scan?

For the clearest and most consistent results, clients should wear light, thin and close-fitting clothing. Reflective clothing, skirts, wide-leg trousers, high-neck garments and hoodies should be avoided.

Clients should remove shoes, socks and all metal jewellery, including rings, watches, bracelets and necklaces. Strenuous exercise should be avoided for at least two hours before the scan, and testing in the morning on an empty stomach is recommended where practical.

For repeat assessments, use similar conditions each time, including the same time of day, similar clothing and a comparable physical state.

How long does a Morphiq™ assessment take?

The weight measurement takes approximately 3–5 seconds, while the 3D body scan takes around 30–35 seconds for one complete rotation.

Allow a little extra time for client setup, positioning and reviewing the results.

Can Morphiq™ track client progress over time?

Yes. Repeat assessments can be stored and compared, allowing clinics to review changes in body shape, circumference measurements and body composition throughout a treatment, fitness or weight-management programme.

Does Morphiq™ include posture assessment?

Yes. The system can assess areas including head position, shoulder alignment, body tilt, pelvic position, knee alignment and leg shape. This makes it suitable for physiotherapy, rehabilitation, fitness and wellness applications as well as aesthetic and body-contouring clinics.

How can reports be viewed or shared?

Reports can be shown on the main display, accessed through the PC system, printed or sent to the client’s phone or tablet.

What are the dimensions of Morphiq™?

The main unit measures 1760mm high × 735mm wide × 440mm deep. The turntable is 75mm high with a diameter of 600mm, and the floor mat measures 1810mm × 680mm.

What is the maximum supported weight?

Morphiq™ can measure clients weighing up to 220kg. The maximum load of the turntable is 200kg.

Who should not use Morphiq™?

Morphiq™ is not suitable for clients with pacemakers or other implanted electronic devices because the body composition analysis uses a weak electrical current.

Use during pregnancy is not recommended for safety and data-accuracy reasons. Clients must also be able to stand still and unaided on the platform for approximately one to two minutes, so the system may not be suitable for anyone with significant mobility or balance limitations.

What training and support are included?

Morphiq™ includes 1-to-1 Certified training, professional delivery and installation, system setup and ongoing support from Pure Tone Aesthetics. Flexible finance is also available, subject to status and approval.

Morphiq™ system specifications

Morphiq™ combines 3D scanning with 8-electrode DSM-BIA body composition analysis in one integrated professional system.

3D scanning technology

Generates a real 3D body model and automatically records body circumference measurements, physical assessment data and changes in body shape over time.

Body composition measurement

8-electrode DSM-BIA analysis.

Display

27-inch HD touchscreen.

Connectivity

Ethernet and wireless network connectivity.

Maximum measurable weight

Up to 220kg.

Maximum turntable load

200kg.

Power supply

220V / 50Hz / 150W.

System dimensions

Main unit: 1760mm high × 735mm wide × 440mm deep.

Turntable: 75mm high × 600mm diameter.

Floor mat: 1810mm long × 680mm wide.

Net weight

Main unit: 53kg.

Turntable: 10kg.

2 Year Extended Warranty

Enjoy peace of mind with our 2 year extended warranty coverage, ensuring your investment is protected.

UK & International Deliveries

  • UK Delivery 3 Days. Units ordered within the UK and with a UK delivery address will be hand delivered and set-up by a Pure Tone Aesthetics engineer. (Excludes Northern Ireland. Please contact us for shipping costs to Northern Ireland)
  • International Delivery 7 Days. International orders will be shipped by Fedex or a similar courier. Please contact us for a quotation based on your location.
  • For full delivery & returns information click here

Helpful 3D Body Analysis Guides

Learn more about 3D body scanning, body composition analysis, body shape tracking and how clinics can use scan data in professional consultations.

  • What Is a 3D Body Composition Scanner?

    Understand how 3D body modelling and body composition analysis work together in professional clinic consultations.

    Read scanner guide 
  • 3D Body Scan vs Body Composition Analysis

    Learn the difference between visual body shape scanning and internal composition data such as fat, muscle and body water.

    Read analysis guide 
  • Why Body Composition Matters More Than Weight Alone

    See why fat, muscle, water, visceral fat and body shape can give clinics a clearer view than weight alone.

    Read composition guide 
  • Morphiq™ vs Morphiq Pro™

    Compare the professional Morphiq™ system with the premium mirror-style Morphiq Pro™ to choose the right option for your clinic.

    Compare Morphiq™ systems 
1 of 4

Discover how Morphiq™ can help you attract new clients, improve patient outcomes, and generate additional revenue for your clinic.

Contact form

  • "Proud to be a CPD Approved Provider, demonstrating our commitment to the highest standards of training and excellence in aesthetics!"